Put the water-containing cooked food in the vacuum chamber, and quickly evaporate and absorb heat through the food moisture in the vacuum state, so as to achieve the effect of rapid cooling, and quickly avoid the bacterial breeding period of 60 to 30 degrees Celsius. It is suitable for high-temperature cooked food and fast food with loose structure.
And the whole process of cooked food cooling is carried out in a fully enclosed vacuum environment, so as to achieve aseptic cooling. The cooling process has an even drop in temperature from the inside of the food to the outside. After cooling, it will not be cold outside and hot inside.
1. Double-stage water catcher design, energy saving and consumption reduction, better cooling effect;
2. Intelligent control, one machine with multiple functions, adjust the temperature at will;
3. Touch screen control, one-button start;
4. Set and record the pre-cooling temperature requirements of different products, which is convenient for employees to choose and operate.
5. Stainless steel material, clean and hygienic, easy to clean;
6. Small footprint, can be embedded in the wall, and can be installed in production lines with limited space;
7. The remote monitoring function can be selected to understand the operation status of the vacuum cooler in real time and troubleshoot remotely.
Model |
Processing Weight/Cycle |
Door |
Cooling Method |
Vacuum Pump |
Compressor |
Power |
HXF-15 |
15kgs |
Manual |
Air Cooling |
LEYBOLD |
COPELAND |
2.4KW |
HXF-30 |
30kgs |
Manual |
Air Cooling |
LEYBOLD |
COPELAND |
3.88KW |
HXF-50 |
50kgs |
Manual |
Water Cooling |
LEYBOLD |
COPELAND |
7.02KW |
HXF-100 |
100kgs |
Manual |
Water Cooling |
LEYBOLD |
COPELAND |
8.65KW |
HXF-150 |
150kgs |
Manual |
Water Cooling |
LEYBOLD |
COPELAND |
14.95KW |
HXF-200 |
200kgs |
Manual |
Water Cooling |
LEYBOLD |
COPELAND |
14.82KW |
HXF-300 |
300kgs |
Manual |
Water Cooling |
LEYBOLD |
COPELAND |
20.4KW |
HXF-500 |
500kgs |
Manual |
Water Cooling |
LEYBOLD |
BIT ZER |
24.74KW |
HXF-1000 |
1000kgs |
Manual |
Water Cooling |
LEYBOLD |
BIT ZER |
52.1KW |
TT, 30% deposit before production,70% balance before shipment.
1~ 2 month after Huaxian receives payment.
Safety wrapping, or wooden box, etc.
We will tell you how to install or send an engineer to install according to customer's requirement (negotiation installation cost).
Yes, depend on customers' requirement.